L’Energètica achieves 4,000 supply points
15/01/2025
The public renewable company now supplies all Departments of the Generalitat
The company plans to multiply by ten the energy supplied to the Administration this year.
L’Energètica begins the year reaching 4,000 supply points managed across the Administration, with the inclusion of all the Departments of the Generalitat of Catalonia in its user portfolio. Specifically, the renewable company achieves this first quarter of 2025 the 4,004 supplied points, multiplying by four the thousand that were supplied last year and exceeding the initial goal of 3,000 points with the change of the year. With this increase in the number of consumers, L’Energètica expects an increase in the energy supplied that will multiply by ten what it supplied last year, from 55 gigawatt-hours (GWh) in 2024 to 500 GWh this 2025.
The largest consumer of L’Energètica is Ifercat (Catalonia Railway Infrastructure), with an annual consumption of 97.3 GWh of energy to supply lines 9 and 10 of the Barcelona metro. This year, users have been added such as the Department of Justice, with 88.1 GWh for penitentiary centers and judicial offices; half a thousand institutes and other educational centers, with 37.4 GWh; the General Directorate of Police, with 36.8 GWh for the Mossos d’Esquadra police stations; the Department of Territory, Housing, and Ecological Transition, with 26.4 GWh; and the Department of Social Rights and Inclusion, with 19.7 GWh.
The data was announced by the general director of L’Energètica, Daniel Pérez, in a presentation to the Commission for Ecological Transition of the Parliament of Catalonia. He also specified that, once the entire Administration of the Generalitat is covered, L’Energètica has also advanced in supplying clean energy to entities in its public sector, with the inclusion of Salud Sant Joan de Reus as users, with an annual consumption of 19.2 GWh, and the Catalan Audiovisual Media Corporation, with 13.8 GWh, in addition to Ifercat itself. Throughout this year, it is also expected to supply the infrastructures of ATL (Water Supply Agency of Ter-Llobregat) and next year, more health facilities in the public system.
During the presentation, Daniel Pérez also explained the generation projects that L’Energètica has underway, which is currently in the process of installing 265 rooftop installations that will add a renewable power of 59 peak megawatts (MWp). He also announced that the company plans to call this year for the second public call for the purchase of solar parks, after the first, launched in July, was completed with the purchase of a solar park in Vidreres (La Selva) and potential participation in a solar park in Sant Fruitós de Bages (el Bages), which is in the analysis phase.