The Trucafort wind farm is the largest with L’Energètica’s participation. Located in the Argentera mountain range, in the municipalities of Pradell de la Teixeta, l’Argentera, la Torre de Fontaubella and Colldejou, between Priorat and Baix Camp, it was one of the first to come into operation in Catalonia in 1999.
The facility consists of 91 wind turbines, with a combined capacity of 29.85 MW and an estimated production of 60 GWh per year. L’Energètica’s stake (9.65%) generates electricity equivalent to almost a third of the consumption of the Sant Joan de Reus Hospital.
A repowering of the farm is currently being processed, with a favorable environmental impact statement, which will allow the ninety or so current turbines to be replaced by just seven. This renovation will not only reduce the visual impact but will also increase production to 100 GWh per year, 66% more than the old machines from the historic Catalan company Ecotècnia.
Commissioning of the wind farm with 91 wind turbines and 29.85 MW of power
Avançasa transfers the Government’s stakes in the farm to L’Energètica
Public exhibition of the repowering project: from 91 to 7 wind turbines and a 15% increase in production
Favorable environmental impact statement (EIS) for the repowering project