CST-Hospital de Terrassa Car Park

Location
Terrassa · Vallès Occidental
Installation type
Ground-mounted solar
Energy destination
Self-consumption
Photovoltaic installation at the CST-Hospital de Terrassa car park

The Consorci Sanitari de Terrassa is promoting a photovoltaic plant at the P1, P2, and P3 car parks of the Hospital de Terrassa. The installation, which will be undertaken by L’Energètica, is part of the CST Batega Verd project.

With a peak power of 2.3 MWp, it will generate a production of 2.89 GWh annually, the largest in a Catalan hospital. In fact, 30% self-consumption will be achieved, saving 818 tonnes of CO₂.

The installation consists of 3,932 photovoltaic panels on new canopies and pergolas, a new line of projects from L’Energètica to make use of the surface area of car parks and other urbanized spaces.

The investment is 3.29 million euros and includes more than twenty charging points for electric vehicles.

Technical data

  • 2.31MWp

    Peak power

  • 3,992

    Solar panels

  • 2.89GWh

    Estimated annual production

  • 3.29M€

    Investment

Consumption equivalence

The energy produced each year by L'Energètica's share of this installation is equivalent to the annual consumption of:

  • 49

    Secondary schools

  • 24

    Primary care centres (CAP)

  • 58

    Fire stations

  • 30%

    of the consumption of CST-Hospital de Terrassa

  • 818

    Tonnes of CO2 saved

Video

Gallery

L'Energètica
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.