Roc de la Mel solar farm

Location
Casserres · Berguedà
Installation type
Ground-mounted solar
Energy destination
Healthcare centers
Roc de la Mel solar farm in Casserres (Berguedà)

The Roc de la Mel solar farm, in Casserres (Berguedà), was acquired by L’Energètica as part of the 2025 Public Call. It was the first ground-mounted photovoltaic installation in the county to be connected to the grid, with a capacity of 1.63 MWp.

The plant has 2,712 panels and an estimated production of 2.56 GWh per year. The electricity generated, equivalent to 150% of the consumption of Berga Hospital, is destined for public healthcare centers.

The acquisition of the farm involved an investment of 1.16 million euros and contributes to the decarbonization of public services by avoiding the emission of 724 tonnes of CO₂ per year.

2024

The General Directorate of Energy approves the prior administrative and construction authorization for the solar farm

2024

Technical data

  • 1.63MWp

    Peak power

  • 2,592

    Solar panels

  • 2.56GWh

    Estimated annual production

  • 1.16M€

    Investment

Consumption equivalence

The energy produced each year by L'Energètica's share of this installation is equivalent to the annual consumption of:

  • 43

    Secondary schools

  • 21

    Primary care centres (CAP)

  • 51

    Fire stations

  • 150%

    of the consumption of Berga Hospital

  • 724

    Tonnes of CO2 saved

Video

Gallery

L'Energètica
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.