The Roc de la Mel solar farm, in Casserres (Berguedà), was acquired by L’Energètica as part of the 2025 Public Call. It was the first ground-mounted photovoltaic installation in the county to be connected to the grid, with a capacity of 1.63 MWp.
The plant has 2,712 panels and an estimated production of 2.56 GWh per year. The electricity generated, equivalent to 150% of the consumption of Berga Hospital, is destined for public healthcare centers.
The acquisition of the farm involved an investment of 1.16 million euros and contributes to the decarbonization of public services by avoiding the emission of 724 tonnes of CO₂ per year.
The General Directorate of Energy approves the prior administrative and construction authorization for the solar farm
L’Energètica pre-selects the farm within the framework of the 2025 Public Call with a planned investment of 1.16 million euros
· Visit by the Minister of Territory, Housing and Ecological Transition, Sílvia Paneque
· L’Energètica connects the solar farm to the grid to supply electricity to healthcare centers
Technical data
Consumption equivalence
The energy produced each year by L'Energètica's share of this installation is equivalent to the annual consumption of: