L’Energètica Takes Over Management of the Can Trinxet Hydroelectric Plant
31/07/2024

This is the first plant recovered from a private operator and will add 660 kW of renewable energy capacity to the public company of the Generalitat
As of July 31, L’Energètica has taken over the management of the Can Trinxet hydroelectric plant, located in Sant Quirze de Besora (Osona). The plant, situated on the banks of the Ter River, has two operational turbines, with a total capacity of 660 kilowatts (kW), and is expected to generate 1,600 megawatt-hours (MWh) of renewable energy annually. This energy potential will be added to what the public company manages, which has the mission to supply all public services of the Generalitat with renewable energy.
Specifically, the energy generated by the Can Trinxet plant will serve to supply water supply and purification infrastructures. Additionally, L’Energètica commits to allocate the revenues derived from the activity to improve the installation while ensuring the environmental flow of the river in this section and enhancing its river connectivity.
The Can Trinxet installation consists of a small dam that directs water to the plant through a 750-meter channel. The plant has two operational turbine-generator units, with capacities of 560 kW and 100 kW. The complex also includes a 95-meter outfall channel that returns water to the Ter. The authorized flow rate for the plant is 8 cubic meters per second (m3/s), and it has an approximate drop of 7 meters.
The Can Trinxet hydroelectric plant is the first that the Generalitat recovers after the concession to a private operator has expired. L’Energètica already manages two underground hydroelectric plants, installed at the distribution station of the Trinitat of the Ter-Llobregat Water Supply Entity, which serve to power the pumping station. They have a capacity of 2 MW.
L’Energètica (Energies Renovables Públiques de Catalunya, SAU), 100% owned by the Generalitat, was launched last year with the goal of multiplying the generation of renewable energy in the country and using it to supply public services of the Generalitat. The main goal, with a horizon of 2040, is to supply all public services of the Generalitat with clean and local energy, which implies having more than 1,000 MW of renewable capacity. With the aim of transforming all energy consumed by the public administration into green, it also promotes the electrification of mobility, facilitating electric vehicle charging points and the decarbonization of thermal consumption.


