This solar park in Maresme is the first site freed up by the removal of tolls on Catalan motorways that L’Energètica has converted into a generation facility. Located on the C-32 in Santa Susanna, the project is an example of how anthropised spaces—heavily altered or degraded—can also be repurposed for renewable energy deployment.
The facility features 3,312 photovoltaic panels, with a capacity of 2.07 MWp and an estimated production of 2.9 GWh per year, which will save 821 tonnes of CO₂.
It is part of a plan that includes installations on the C-32 and other motorways, aiming to achieve energy self-sufficiency for the Generalitat road network.
Removal of the C-32 motorway toll plaza in Santa Susanna
· The Government announces a plan to achieve energy self-sufficiency across the road network with an overall investment of €40 million
· Contract awarded for the installation of the solar park
Completion of civil works and start of the grid connection process for the solar park
The solar park is connected to the grid and begins supplying electricity for the Generalitat road network
Technical data
Consumption equivalence
The energy produced each year by L'Energètica's share of this installation is equivalent to the annual consumption of: